Bulgaria Ski discussion board

Half pipe news

Snowshack Steve Author: posts : 13   (Beginner)Date : 12-17-03 13:01

Half pipe news

Quick update on what's happening. The half pipe has been built near the studenets middle station just above the tunnel. 110 meters long, 17 degree drop, 3 meter high walls. lighting is being installed to allow night riding. The first and only snow cannon in Pamporovo will start this week once the temp is low enough. It will provided a good base on the pipe. The pipe cutter, attachment for piste machine to cut the angle on the wall, is paid for and on it's way from finland. arrival 3-5 days. ...
Quick update on what's happening. The half pipe has been built near the studenets middle station just above the tunnel. 110 meters long, 17 degree drop, 3 meter high walls. lighting is being installed to allow night riding. The first and only snow cannon in Pamporovo will start this week once the temp is low enough. It will provided a good base on the pipe. The pipe cutter, attachment for piste machine to cut the angle on the wall, is paid for and on it's way from finland. arrival 3-5 days. All sounds like a great step forward for Pamporovo!
Wishing you all a great season riding and skiing!!!
Steve.

[read more]

Ogen Author: posts : 13   (Beginner)Date : 12-17-03 13:04

re: Half pipe news

Any chance we can get a picture of that Steve ?Smile)

Snowshack Steve Author: posts : 13   (Beginner)Date : 12-17-03 13:10

re: Half pipe news

If i am sober enough the next couple of days will try to get a digi pic and forward it to Nic.
DGJ Author: posts : 13   (Beginner)Date : 12-17-03 17:21

re: Half pipe news

sounds like a good way to crack another couple of ribs to me... Cool

Dan
DGJ Author: posts : 13   (Beginner)Date : 12-17-03 17:23

re: Half pipe news

sounds like a good way to crack another couple of ribs to me... Cool

Dan
DGJ Author: posts : 13   (Beginner)Date : 12-17-03 17:24

re: Half pipe news

sounds like a good way to crack another couple of ribs to me... Cool

Dan