Was over in pamps at the beginning of August and half way up the wall on the left hand side there was some major building going on!
The build can only be described as a bloody big concrete cylinder that looked as though it was there to hold water!! Not 100% sure as all the guys working there spoke no english at all! Looked like it could be some kind of holding / pumping station or something though.
hope they are sorted soon, or i am going to have to make a new forcasting machine,booked for jan and feb, had great snow last year but anything can happen
The lake has been filled with water this summer, and I have been told that the 'dispute' has been resolved - will have to wait until the winter to see if this is true !!!