Author:
posts : 13 (Beginner)Date : 11-07-08 11:57
pictures will appear on 'the other side' the chair lift at the top on Marky 2 is ready and so are the snow cannon bases on 1,2 and 3. Theres also been a selection of widening and gradient levelling between Makry 1 and 2 down the road.



